FAQ

Permit questions, answered.

The questions contractors and homeowners ask us most, answered by our team.

How fast will the master permit come out?

The timeline depends on the municipality, project complexity, completeness of the submitted documents, and the number of review cycles required.

For new residential construction, the initial review generally takes around 30 business days for qualifying projects, while larger or more complex projects may require longer. The entire permitting process can take several weeks to several months, especially if corrections or additional approvals are needed.

Working with an experienced permit expediter can help minimize delays by ensuring accurate submissions, monitoring reviews, and coordinating responses to comments.

Read on its own page
How many sub-applications do I need for the construction permit?

The number of sub-applications depends on the scope of construction and the local building department's requirements.

For a typical new residential construction project, the most common sub-permits include electrical, plumbing, mechanical (HVAC), and roofing. Additional permits may be required for pools, fences, driveways, windows and doors, fire protection systems, or other specialized work.

Each municipality has its own requirements, so the exact number is determined by the approved plans and permit conditions.

Read on its own page
What is the role of a permit runner?

A permit runner, also known as a permit expediter, helps manage the permitting process between the property owner, contractor, design professionals, and local building department.

Responsibilities typically include preparing and submitting applications, tracking permit status, communicating with municipal reviewers, coordinating corrections, following up on approvals, and assisting with permit issuance.

The main goal is to streamline the process, reduce administrative delays, and help obtain permits as efficiently as possible.

Read on its own page
Who is responsible for responses?

Responsibility for responding to building department comments depends on the nature of the corrections.

Architects and engineers are responsible for technical comments involving drawings, design calculations, and code compliance. Contractors are typically responsible for construction-related information, licensing, and trade-specific documentation.

The permit expediter coordinates communications, tracks outstanding corrections, submits revised documents, and follows up with the reviewers to keep the permitting process moving.

Read on its own page
Can you build a house without a permit?

No. Building a new house in Florida requires a building permit issued by the appropriate local authority before construction begins.

Building without the required permits can result in stop-work orders, fines, enforcement action, difficulties obtaining insurance, and potential requirements to modify or remove unauthorized construction.

The permit process ensures compliance with building codes, zoning regulations, structural safety standards, and other applicable requirements.

Read on its own page
Do I need a permit to build a wall or fence?

In most cases, yes, particularly for structural walls, retaining walls, and many types of fences.

Permit requirements depend on the municipality, fence or wall height, location, materials, and type of construction.

Some jurisdictions allow certain small or nonstructural fences without a building permit, but zoning restrictions, property setbacks, visibility requirements, and HOA regulations may still apply.

Always verify the local requirements before installation.

Read on its own page
Is it better to do a renovation or a new construction permit?

The correct permit type depends on the existing building and the proposed scope of work.

A renovation permit is generally appropriate when modifying, repairing, or improving an existing structure while retaining the portions necessary to qualify as an alteration under applicable codes.

A new construction permit is required when building a completely new structure or when the project qualifies as new construction under local regulations.

Renovation permits may involve fewer requirements for limited projects, but extensive renovations can require substantial structural upgrades and additional code compliance. The permit classification must reflect the actual work rather than simply choosing the faster or less expensive option.

Read on its own page
Do I need a pool permit?

Yes. Constructing a new swimming pool in Florida generally requires a permit.

The permitting process typically involves review of pool engineering plans, structural details, plumbing, electrical systems, setbacks, drainage, and pool safety barriers.

Depending on the jurisdiction and property location, additional approvals may be required before the pool permit can be issued.

Read on its own page
How long does a permit last?

For single-family homes, the rule changed on July 1, 2026 (Florida HB 803). A building permit for a single-family home now expires one year after it's issued, or when the next edition of the Florida Building Code takes effect, whichever is later.

For other projects, a permit generally becomes inactive or expires if construction does not begin within 180 days of issuance or if work is suspended or abandoned for approximately 180 days. Approved inspections generally help keep the permit active.

Extensions or renewals may be available through the local building department, depending on the circumstances.

Read on its own page
Do I need a Notice of Commencement (NOC) to build?

For most substantial construction projects in Florida, yes.

A Notice of Commencement is a legal document recorded in the county's public records that identifies important project information, including the property owner, contractor, and construction location.

For typical private construction projects exceeding $5,000, an NOC is generally required, subject to statutory exceptions and special thresholds. It must be recorded and properly posted before the first inspection, as applicable.

The NOC is also important because it establishes notice under Florida's construction lien laws.

Read on its own page
How do I close a construction permit?

To close a construction permit, all required work must be completed in accordance with the approved plans and applicable building codes.

The contractor must schedule and successfully pass all required inspections, including the final inspections for the master permit and associated sub-permits.

Any outstanding violations, inspection failures, fees, or administrative holds must be resolved.

Once the building department verifies that all requirements have been satisfied, the permit can be officially finalized and closed.

Read on its own page
How do I get a CO (Certificate of Occupancy)?

A Certificate of Occupancy (CO) is issued by the local building department when a new building meets the applicable requirements for legal occupancy.

To obtain a CO, construction must be substantially complete, all required final inspections and approvals must be obtained, and any outstanding building department conditions must be resolved.

Depending on the project, additional approvals may be needed from fire, zoning, engineering, utilities, or other government departments.

Once all requirements are satisfied, the building department can issue the CO, allowing the property to be legally occupied.

Read on its own page
How much does the permit fee cost?

Construction permit fees vary depending on the municipality, project size, type of construction, and estimated construction value.

For new residential construction, permit fees are typically calculated based on the total construction cost or square footage, depending on the local building department's fee schedule.

For example, the City of Fort Lauderdale lists a master building permit fee of 1.75% of the construction cost, with a minimum fee of $131. Additional fees may include plan reviews, electrical, plumbing, mechanical, roofing, zoning approvals, impact fees, and other municipal charges.

Permit fees are paid directly to the municipality and are separate from permit expediting service fees. The exact amount can be determined once the project details and applicable jurisdiction are confirmed.

Read on its own page